Reliable Dental Studio (RSU)
pickup and delivery

Priority Lane · Same-Week Options

When the Patient Can’t Wait.

Emergency repairs and tight timelines happen. Our rush lane moves your case to the front of design, milling and quality control — without cutting corners.

Rush-eligible work

  • Single crowns & bridges
  • Denture repairs & relines
  • Provisional restorations
  • Night guards & appliances
  • Implant crowns (select systems)
  • Shade re-matches

A Priority Lane, Not a Shortcut

A rush case moves to the front of the design and milling queue, but it never skips a step. The same verified data, the same CAD checks, and the same documented quality control apply, just on a compressed schedule. Turnaround as fast as 24 hours is available on suitable cases, so an emergency repair or a tight patient timeline does not become a second appointment or a compromised restoration.

Fastest Turnaround
24hFastest Turnaround
Lab Locations
3Lab Locations
Full QC on Rush Cases
100%Full QC on Rush Cases
Rush Lane Open Weekly
7dRush Lane Open Weekly

How a Rush Case Moves Through the Lab

  1. 1

    Call Ahead

    We confirm feasibility and the due date

  2. 2

    Send Same Day

    Digital upload or local pickup

  3. 3

    Priority Bench

    Front of the design & milling queue

  4. 4

    Express Return

    Overnight shipping back to you

Have a Case That Can’t Wait?

Call us before you send it — we will confirm the timeline on the spot.

Frequently Asked Questions

Not Sure If Your Case Qualifies?

A quick call answers it — rush feasibility depends on material and system.

Contact Us
What counts as a rush case?

Emergency repairs, a broken restoration before a big event, a patient traveling out of town, or any timeline the standard schedule will not make. Call us before you send it and we will confirm feasibility and a realistic due date on the spot.

Which materials are rush-eligible?

Most single-unit crowns and bridges, denture repairs and relines, provisionals, night guards and appliances, and select implant-crown systems are rush-eligible. Complex full-arch and implant work depends on the components and system, so confirm with us before sending.

Do rush cases skip quality control?

No. Rush cases run through the same documented quality control as every other case; only their priority in the queue changes. We would rather quote you an honest date than ship work that has not been verified.